Broad mobilisation to produce vaccines

In Puurs, where the Pfizer Group is building a new production zone for its Prevenar 13 vaccine, Actemium Leuven was awarded a contract to engineer, build and implement clean distribution systems to bring ultra-clean gas and liquids to the production area, as well as black distribution systems to remove liquids, industrial steam, rainwater, etc. Actemium Leuven is handling the mechanical systems and Actemium Herentals the electrical  systems and process automation. Actemium Digital Factory Ghent will also be working on the project to supply the bottle washing, filling and inspection robot and handling system. At the same site, Hooyberghs HVAC worked on 11 air handling units (grades C and D).