Three contracts for the hospital complex in French Polynesia

VINCI Facilities Polynésie has won the five-year multi-technical maintenance contract for the hospital complex in Tahiti, French Polynesia. The company also won a contract in 2019 to replace a 1,500 kW cooling unit, a move expected to cut electricity consumption by more than 10%. The Energy Ministry in French Polynesia also selected Cegelec Polynésie Building Solutions to carry out the process works package (chilled water production) of the hospital’s SWAC (Sea Water Air Conditioning) system, which uses sea water as a cold source for the climate control systems.